Ships: Normally Ships in 1-5 Business Days
Chicago Pneumatic CP 0003 Tamper
Product code: 142455
Sale only
Please wait...
Utilities
Shop or rent utility, municipal and industrial equipment from RTO, including hydraulic tools, pumps, pipe tools, dewatering equipment, power units, and accessories.
Ships: Normally Ships in 1-5 Business Days
Product code: 142455
Sale only
Ships: Normally Ships in 1-5 Business Days
Product code: 142456
Sale only
Ships: Normally Ships in 1-5 Business Days
Product code: 142457
Sale only
Ships: Normally Ships in 1-5 Business Days
Product code: 142458
Sale only
Ships: Normally Ships in 1-5 Business Days
Product code: 142459
Sale only
Ships: Normally Ships in 1-5 Business Days
Product code: 142460
Sale only
Ships: Normally Ships in 1-5 Business Days
Product code: 142461
Sale only
Ships: Rental based on availability. Purchase normally ships in 1-5 business days.
Product code: 142463
Sale only
RTO supplies equipment for utility construction, municipal maintenance, infrastructure repair, dewatering, pipe work, field service, and industrial applications.
Browse hydraulic tools, power units, pumps, pipe freezing and thawing equipment, dewatering systems, hoses, fittings, and related jobsite accessories. Use the individual product specifications to compare capacity, power requirements, connections, included equipment, and rental or purchase availability.
Helpful answers
RTO supplies hydraulic, pneumatic, gas, battery, and manual tools for utility construction and maintenance, including breakers, tampers, post pullers, cable preparation tools, manhole equipment, hydraulic hoses, pumps, and related accessories.
Start with the task, material, required force or capacity, available hydraulic flow, air supply, voltage, or engine power, and the working clearance. Then confirm hoses, couplers, bits, dies, lifting attachments, and other required accessories.
Yes. Selected utility tools are available for rent. Confirm the job requirements, power source, compatible accessories, delivery location, lead time, and project dates before scheduling.